Decommissioned for 3 months.
Regular service.
2021 - overhaul of the gearbox.
The machine only drove on paved surfaces and transported lighter materials.
The cabin of the machine inside was not affected by the fire, the control units are functional and preserved.
The fire affected only the upper part of the engine and the wiring, the main engine wiring was damaged.
TRANSMISSION FULLY FUNCTIONAL.
AXLES AND BOOM OK, IT HAS A THIRD HYDRAULIC CIRCUIT.
The machine is repairable, but it is also possible to use it for spare parts.
The technical condition corresponds to age and mileage / operating hours. Personal inspection is required. Later claims shall not be taken into account.
This text has been translated using Google Translate. Veacom is not liable for any inaccuracies or misunderstandings which arise through the translation.