Engine repair using a semi-engine and replacement of other components. Engine resealing and assembly at 18,271 operating hours (Material: ring, bushing, stud, turbo, housing, valve, water separator filter, fuel filter, nozzle, tube, engine block, hose, gasket, oil cooler, gear, camshaft , bearing, oil Cat Deo.
The worked raid is approximate.
Shovel 120cm. Bucket 0.82m3.
The machine is taken out of operation for 4 months.
The technical condition corresponds to age and mileage / operating hours. Personal inspection is required. Later claims shall not be taken into account.
This text has been translated using Google Translate. Veacom is not liable for any inaccuracies or misunderstandings which arise through the translation.